Multihead weigher main vibrator replacement steps
Remove all feed hopper and feeder pan of multihead weigher
Record the location of the waterproof cover so that you can quickly mount it back to the same location
Remove all dust ring of waterproof cover
Find the solid screw on the waterproof cover and remove it all
Then lift the waterproof cover up
Then find the main vibrator and replace the new one.
Middle one is main vibrator, side one is linear vibrator.
Please note that when installing the vibrator line it must be sure to install in place.
After replacing the main vibrator, all components follow original position to install back is ok
Finally,please note when installing the dust ring make sure the installation method, or else it will be more difficult to install in place.
When get dust ring, then turn the dust ring.
Install the vibrator part first, then dust ring part.
All are installed in place then install dust ring spring.